Monday, October 11, 2010

Total Recall - Day 29

The students did not have school today so we had a small group come in today.  Although the group was small, progress was made on the robot. 

Robot progress tonight:
  • Door zip tie was attached
  • Door frame mount was cut down to size and routered for weight reduction
  • Painted the new wheels silver
  • Painted the deck red with two coats of paint
  • Drilled new wheels for the hubs
  • Corner lexan inserts for the bucket.  This also replaced the support plywood as well as the washers inside the bucket. 
  • Jonny used the mill to shave the ends down on the slide which will have the microswitches on it.  He used the drill press to drill for the 2/56 machines screws.  He got two holes drilled for the top microswitch. 
  • David M worked on the arm 
  • Claude updated the CAD drawings for the door motor and mount
  • Jonny and Scott soldered the leads on the door motor 
  • Daniel C cut on the fingers for the data port from the 1/4" lexan
  • Grey and David brought in the outer panels for the omni wheels they completed at Tim Ousley's house on Sunday.

Michelle, Achi and Keren worked on the BEST award tonight.  Lauren came in after band to work on the display with Linda.  Linda and I discussed the layout of the display and how we could possibly save some money by not buying so much cloth.  

Posted via email from Reflexions

No comments:

Artistic Representation of my life.

Artistic Representation of my life.
From: coachnorm, 14 minutes ago



My artistic representation for Educational Environments Grad School class at Texas State University

SlideShare Link